[1.07.06] High speed rail station has 2 different machine costs

Moderator: Vic

Post Reply
Soar_Slitherine
Posts: 436
Joined: Sun Jun 07, 2020 11:33 am

[1.07.06] High speed rail station has 2 different machine costs

Post by Soar_Slitherine »

The high speed rail station is listed as costing both 20 machines and 5 machines per turn to construct in the asset details window. The actual amount consumed during construction seems to be 20 per turn, but misleadingly, the asset construction window lists the cost as only 5. This is from a savegame started in patch 1.07.03.


Image
Attachments
DesktopSc..57.05.21.jpg
DesktopSc..57.05.21.jpg (183.87 KiB) Viewed 2 times
User avatar
Vic
Posts: 8342
Joined: Mon May 17, 2004 2:17 pm
Contact:

RE: [1.07.06] High speed rail station has 2 different machine costs

Post by Vic »

Will be fixed in the upcoming open beta. eta monday.
Thanks for spotting that one. It is indeed very misleading.
Visit www.vrdesigns.net for the latest news, polls, screenshots and blogs on Shadow Empire, Decisive Campaigns and Advanced Tactics
Post Reply

Return to “Tech Support”