Matrix Games Forums

Forums  Register  Login  Photo Gallery  Member List  Search  Calendars  FAQ 

My Profile  Inbox  Address Book  My Subscription  My Forums  Log Out

Condition of Pre WW2 Annexed Nations Railways

 
View related threads: (in this forum | in all forums)

Logged in as: Guest
Users viewing this topic: none
  Printable Version
All Forums >> [New Releases from Matrix Games] >> The Operational Art of War IV >> Condition of Pre WW2 Annexed Nations Railways Page: [1]
Login
Message << Older Topic   Newer Topic >>
Condition of Pre WW2 Annexed Nations Railways - 9/1/2019 2:42:48 PM   
Lobster


Posts: 3243
Joined: 8/8/2013
From: Third rock from the Sun.
Status: offline
https://www.feldgrau.com/WW2-German-Baltic-States-Military-Railroads

Military Railroads in the Baltic States 1940 to 1945

WW2 German Railroads Baltic States

With the incorporation of the Baltic States into the Soviet Union in 1940, approximately 7.000 km (4.500 miles) of rail lines were added to the Soviet rail network. Of those 7.000 km (4.500 miles), approximately 2.900 km (1.900 miles) were wide gauge (1.524mm), 2.000 km (1.300 miles) were standard gauge (1.435mm) and 2.100 km (1.400 miles) were narrow gauge lines. Nearly all of the rail lines the Soviets inherited from the former Estonian, Latvian and Lithuanian railroad administrations were in excellent technical order; though very few were electrified. After the Soviet annexation, all of the railroad engines of the former Baltic States were re-identified with Cyrillic letters, though they were a direct translation of their Latin text equivalents.

In addition to the military and political forces brought in to the Baltic States, the Soviets also imported a large number Soviet railroad engines and rolling stock into the Baltic States. Interestingly, the Soviets did not begin to convert the standard and narrow gauge lines in Estonia, Latvia, and Lithuania over to wide gauge until March of 1941. It need be remembered that many of the existing rail lines in the Baltics originated from the Czarist period, thus they remained in the wide gauge throughout the interwar period. This allowed the Soviets to use many of the main trunk lines in the Baltics with no difficulties. The Soviets placed their primary rail conversion efforts in Lithuania as well as in the former Vilnius territory plus eastern Poland - that is, they converted those rail lines first which was closest to the German-Soviet border regions.


Many scenario designers seem to have missed this.

Edit: I should add that, for some reason, having the rail lines through the newly acquired Soviet territories already converted to Europe standard gauge is deeply ingrained in the war gaming community and has been for some time. One game where they got it right was in SPI's War in the East published long, long ago.


< Message edited by Lobster -- 9/1/2019 3:16:04 PM >


_____________________________

http://www.operationbarbarossa.net/

"Getting back to reality...I'll only go as a tourist!"
Post #: 1
RE: Condition of Pre WW2 Annexed Nations Railways - 9/1/2019 11:36:49 PM   
Zovs


Posts: 4299
Joined: 2/23/2009
From: United States
Status: offline
Good point on standard and wide gauge but TOAW only has one rail gage so you'd have to break the line when you designed.

SPI War in the East (1974) and then War in Europe (1976) by defacto had you convert those rail lines. But a better representation was by GDW and first DNO and then later Fire in the East/Scorched Earth had rules for both standard and wide gauge and each its own rail capacity and each had to be converted (back and forth) and only one side or the other could use there gauge until it was converted.

< Message edited by Zovs -- 9/1/2019 11:37:27 PM >


_____________________________


War in the East/War in the East II - Alpha Test Teams
WarPlan Beta Tester
DG CWIE2 tester/SPWW2 and SPMBT playtester/scenario creator

(in reply to Lobster)
Post #: 2
Page:   [1]
All Forums >> [New Releases from Matrix Games] >> The Operational Art of War IV >> Condition of Pre WW2 Annexed Nations Railways Page: [1]
Jump to:





New Messages No New Messages
Hot Topic w/ New Messages Hot Topic w/o New Messages
Locked w/ New Messages Locked w/o New Messages
 Post New Thread
 Reply to Message
 Post New Poll
 Submit Vote
 Delete My Own Post
 Delete My Own Thread
 Rate Posts


Forum Software © ASPPlayground.NET Advanced Edition 2.4.5 ANSI

0.102